Share-Oke Ode Road, Kwara State, Nigeria
Description:
The design is a 80mm thick asphalt road, with culverts along the road. The rehabilitation of pre and post colonial steel bridges along the road are also features of the contract. Support steel corbels were a major design component of the rehabilitation design works on the bridges.
The design task also include drainage lines and refit of expansion joints on the old and dilapidated bridges.
Project Status: Completed
Project Cost: $5m
Practice Engagement: Structural Engineers & Project Managers
Project Gallery
![](https://static.wixstatic.com/media/65baea_0f134d7b979a47a3b9109f0afbd1f374~mv2.jpg/v1/fill/w_450,h_450,q_90/65baea_0f134d7b979a47a3b9109f0afbd1f374~mv2.jpg)
![](https://static.wixstatic.com/media/65baea_0b4c1ea1f2af46bd83eec0d8e8fba7d3~mv2.jpeg/v1/fill/w_450,h_450,q_90/65baea_0b4c1ea1f2af46bd83eec0d8e8fba7d3~mv2.jpeg)
![](https://static.wixstatic.com/media/65baea_31d678e26afb40269adf384706d10ea1~mv2.jpeg/v1/fill/w_450,h_450,q_90/65baea_31d678e26afb40269adf384706d10ea1~mv2.jpeg)
bottom of page